Degen Dojo

OpenSeaConcept, direction, production2025

OpenSea needed to explain a new rewards system to an audience that hates being marketed to. The answer: a 90s karate dojo parody commercial.

Brief

OpenSea was launching OS2, a new XP rewards system with cross-chain swaps and marketplace upgrades built to re-engage both crypto-curious newcomers and seasoned traders. The challenge: make a product explainer people actually want to watch. This audience is sophisticated, skeptical of corporate marketing, and responds to work that feels genuine and culturally fluent. A polished brand video would have been ignored. Something unexpected, funny, and shareable could actually move.

Concept

Lean into nostalgia so hard it becomes its own joke. Low-budget local TV commercials from the late 80s and early 90s are a shared cultural reference: the over-the-top voiceover, the awkward choreography, the inexplicably confident energy of a Florida karate instructor at 2am. Nobody had used that world to launch a Web3 product. Enter Chad Magnum, Head Sensei of Degen Dojo. The format let the product features write themselves. Cross-chain swaps became a belt rank. XP rewards became tournament points. The marketplace became the dojo. Every feature got a moment, and none of them felt like a feature.

The spot

Degen Dojo, the OpenSea OS2 launch spot

Production

The spot was produced on a hybrid pipeline: generated live-action footage combined with traditional motion graphics for the OpenSea UI and branding. All motion graphics, title cards, lower thirds, and the logo animation were built in After Effects, the same craft approach as any broadcast spot. The result is a production that would have needed a full crew and a week of shooting, delivered by a small team without sacrificing the visual and tonal quality the concept demanded.

After Effects project timeline for the spot
Production workflow
Compositing and motion graphics in After Effects

The references that made Chad Magnum possible

Next project

Dr Pepper Roadshow